Preserving Natural Wetlands
MAGNA Chooses Sustainability in Stormwater Management
In 2020, Brookfield Residential tasked MAGNA Engineering Services Inc. with designing a stormwater solution for Livingston Pond E Storm Park. MAGNA solutions made it possible to preserve the existing 21-ha wetland facility with significant grade challenges and implement state-of-the-art stormwater management techniques. Despite its challenges, we chose to integrate the natural wetland into our solution instead of replacing it with our solution.
Sustainable Stormwater Management
The MAGNA Stormpark™️ meets current stormwater requirements, anticipates future needs, and addresses emerging water quality concerns. By treating stormwater as a valuable resource rather than a waste product, MAGNA demonstrates a commitment to sustainability and community well-being.
The Benefits of Stormparks
Despite facing challenges such as groundwater management and construction complexities, MAGNA's expertise and adaptability ensured the project's success. The MAGNA Stormpark™️ has economic, environmental, and societal benefits that outweigh the initial capital cost, making it a cost-effective and sustainable solution for stormwater management. The project net resulted in over $5 million in cost savings -nearly a 30% cost reduction from the initial design.
Ultimately, the Livingston Pond E Stormpark stands as a testament to MAGNA's innovative approach to stormwater management, highlighting the potential to preserve nature while meeting urban development needs.
To learn more about MAGNA's stormwater projects and innovative solutions, visit www.magnaengineering.ca/projects.